Auto-calculated
Manual input
Standard input
Quote Builder
Layout
⚙ Settings
Installed
Ordered
Linear ft
Perimeter
Scrap
Job Info & Exports
Turf
Infill
Rock / Base

Tons and cubic yards are calculated from this job's sqft and each material's depth/density settings — configure those under Settings → Rock / Base Materials.

Edging (Bender Board)
Manage in Settings → Edging Materials
board, stakes, screws
Miscellaneous Items

Seam tape, adhesive, nails, etc. Costs are included in Quote Totals.

Materials Summary
📦
Add turf, infill, and rock to see summary.
Quote Options
Leave blank to use the standard default (Settings → Default Shipping) — the placeholder shows it. Enter a number to override the freight for this one job; clear it to go back to the default. Added to every quote option and marked up by your profit margin.
Site Layout & Roll Plan (Moasure Import)

Import the CSV exported from Moasure for this project's space. The diagram below shows the measured shape with the roll layout overlaid — adjust roll direction, translation, and margins to minimize scrap, then apply the results directly to a turf row.

No layout imported yet for this project. Click "↑ Import CSV" to add one.
Roll Settings

These drive the roll plan on the Layout tab. They're a global default for every project. With a project open, changing a value asks whether to update the global default or just that job. Standard rolls are 15 ft × 100 ft.

Fixed product width — every roll is 15 ft wide.
Length of one physical roll (15 × 100) — the point where a long run gets split across rolls. Not what you order; that's Ordered Linear Ft (Layout sidebar), per job.
Trimmed off each roll's edge for the S-seam (usable width = roll width − trim).
Extra length added to every cut piece before rounding up to the next whole foot.
Turf Products

These appear as options when creating a new project. All rolls are 15 ft wide.

Infill Products

Coverage per bag is used to calculate how many bags are needed based on installed sq ft.

Rock / Base Materials

Default depth is used to pre-fill the depth field on the Rock / Base card when this product is added.

Edging Materials

Edging/border products (bender board, etc.) with name, color, notes, and price per 20 ft board. Pick one per project on the Quote Builder's Edging card — its price feeds the quote and its name/color show on the supplier order.

Miscellaneous Items

Seam tape, adhesive, nails, staples, etc. These appear as selectable items when building a project.

Labor Rates & Price Sheet

Define different rate sets for each crew. Select which crew a project uses via the Crew dropdown in the topbar when a project is open.

Profit Margin

Applied to every quote option's cost (labor + materials + infill + edging + misc) to calculate the customer-facing sell price. Entered as a percentage of the SELL PRICE — e.g. a 30% margin on $700 in costs prices the job at $1,000 ($300 profit ÷ $1,000 = 30%).

Default Shipping

The standard freight cost applied to every project that hasn't set its own. Change it whenever your freight rate changes and every non-overridden project updates to match. To charge a different amount for one job, override it on that project's Quote Builder tab — that override sticks regardless of this default.